Hint
Editable files for UML, BPMN and an interactive Excel tool to collect, prioritise and trace requirements (by Use Case) is available at empirica.
Any use of the list below must reference empirica GmbH.
Building Energy Management System (Bems)¶
Use Cases and Process Models in this category are referenced with “Bems”.
Bems - List of Scenarios¶
- Multi-level lighting/Dimming (UC_Bems_DIM)
- Daylight harvesting (UC_Bems_DHA)
- Occupancy/Vacancy Sensing (UC_Bems_OCU)
- Visual Incentive (UC_Bems_VIS)
- Peak Control (UC_Bems_PCO)
- Peak Prevention (UC_Bems_PPR)
- Peak Shaving Demand (UC_Bems_PSD)
- Peak Shaving Supply (UC_Bems_PSS)
- Authorisation check (UC_Bems_AUT)
Multi-level lighting/Dimming (UC_Bems_DIM)¶
Requirements
Functional Requirements: R1.1.10 Binary Signal R1.1.17 Access-Webservice R1.10.1 BMS-Access R1.10.6 Control - Remote R1.10.7 Automatic - Occupancy Schedule R1.10.8 Automatic - Occupancy Current R1.10.11 Automatic - Air quality R1.10.12 Automatic - Weather R1.11.13 Lighting-Impact R1.11.14 Lightning-Outside R1.11.15 Lighting-Building R1.11.16 Lighting-Floor R1.11.17 Lighting-Room R1.11.18 Lighting-Zone
Non-Functional Requirements: R2.4.3 Building R2.4.4 Floor R2.4.5 Room R2.4.6 Zone R2.7.3 Latency R2.7.4 Response Time
Back to Bems - List of Scenarios
Daylight harvesting (UC_Bems_DHA)¶
Requirements
Functional Requirements: R1.1.10 Binary Signal R1.1.17 Access-Webservice R1.10.6 Control - Remote R1.10.7 Automatic - Occupancy Schedule R1.10.8 Automatic - Occupancy Current R1.10.9 Automatic - Heat demand R1.10.11 Automatic - Air quality R1.11.13 Lighting-Impact R1.11.14 Lightning-Outside R1.11.15 Lighting-Building R1.11.16 Lighting-Floor R1.11.17 Lighting-Room R1.11.18 Lighting-Zone
Non-Functional Requirements: R2.4.3 Building R2.4.4 Floor R2.4.5 Room R2.4.6 Zone R2.7.3 Latency R2.7.4 Response Time
Back to Bems - List of Scenarios
Occupancy/Vacancy Sensing (UC_Bems_OCU)¶
Requirements
Functional Requirements: R1.1.10 Binary Signal R1.1.17 Access-Webservice R1.10.6 Control - Remote R1.10.8 Automatic - Occupancy Current R1.10.9 Automatic - Heat demand R1.10.10 Automatic - Movement R1.10.11 Automatic - Air quality R1.11.13 Lighting-Impact R1.11.14 Lightning-Outside R1.11.15 Lighting-Building R1.11.16 Lighting-Floor R1.11.17 Lighting-Room R1.11.18 Lighting-Zone
Non-Functional Requirements: R2.4.3 Building R2.4.4 Floor R2.4.5 Room R2.4.6 Zone R2.7.3 Latency R2.7.4 Response Time
Back to Bems - List of Scenarios
Visual Incentive (UC_Bems_VIS)¶
Requirements
Functional Requirements: R1.1.10 Binary Signal R1.1.17 Access-Webservice R1.10.6 Control - Remote R1.10.8 Automatic - Occupancy Current R1.10.9 Automatic - Heat demand R1.10.10 Automatic - Movement R1.10.11 Automatic - Air quality R1.11.1 Temperature-Building R1.11.2 Temperature-Floor R1.11.3 Temperature-Room R1.11.4 Temperature-Zone R1.11.5 Humidity-Building R1.11.6 Humidity-Floor R1.11.7 Humidity-Room R1.11.8 Humidity-Zone R1.11.9 Ventilation-Building R1.11.10 Ventilation-Floor R1.11.11 Ventilation-Room R1.11.12 Ventilation-Zone R1.11.13 Lighting-Impact R1.11.14 Lightning-Outside R1.11.15 Lighting-Building R1.11.16 Lighting-Floor R1.11.17 Lighting-Room R1.11.18 Lighting-Zone R1.16.2 Areas R1.16.3 Nominal heting power R1.16.4 Nominal cooling power R1.16.5 Nominal lighting power
Non-Functional Requirements: R2.1.5 Visualisation - Signals R2.1.6 Visualisation - Elements R2.1.7 Visualisation - Colours R2.1.14 Language R2.4.1 Resource R2.4.2 Data Source R2.4.3 Building R2.4.4 Floor R2.4.5 Room R2.4.6 Zone R2.7.3 Latency R2.7.4 Response Time
Back to Bems - List of Scenarios
Peak Control (UC_Bems_PCO)¶
Requirements
Functional Requirements: R1.1.10 Binary Signal R1.1.17 Access-Webservice R1.6.10 Events-Peak R1.6.11 Events-Free R1.7.9 Peaks R1.10.6 Control - Remote R1.10.9 Automatic - Heat demand R1.10.11 Automatic - Air quality R1.12.1 Prevention R1.12.3 Shaving R1.16.2 Areas R1.16.3 Nominal heating power R1.16.4 Nominal cooling power R1.16.5 Nominal lighting power R1.16.6 People occupancy
Non-Functional Requirements: R2.4.1 Resource R2.4.2 Data Source R2.4.3 Building R2.4.4 Floor R2.4.5 Room R2.4.6 Zone R2.7.3 Latency R2.7.4 Response Time
Back to Bems - List of Scenarios
Authorisation check (UC_Bems_AUT)¶
Requirements
Functional Requirements: R1.1.17 Access-Webservice R1.10.1 BMS-Access R1.10.2 Control - Web-Portal R1.10.3 Control- MobileApp R1.10.9 Automatic - Heat demand R1.10.11 Automatic - Air quality
Non-Functional Requirements: R2.5.1 Functional
Back to Bems - List of Scenarios